Description of the job
- Characterisation Plan of the site
- Final remediation project
This area is included in the National Plan of Contaminated Sites, as asbestos-polluted topsoil, soil and subsoil. Upon approval by the Ministry of the Environment and Territory, we carried out 54 corings and over 400 analyses to find asbestos and other pollutants - metals in particular - in different soil layers. After Arpa approved the results we obtained, the final remediation plan was drawn up.
Technical data
- Size of the area: 100.000 m2
- Amount of the contract: 450.000 €
Data
Customer: Immobiliare Beta
Area: Bari
Construction site: Area ex Fibronit
Work Termination: 2005